How can food plants reduce frozen drum thawing time?

Food plants can reduce frozen drum thawing time by thawing only enough to release the product from its drum and liner, then mechanically processing the frozen block into a pumpable slurry. For suitable applications, this avoids waiting for the entire drum to thaw. The slurry still contains frozen particles, so further thawing in the machine or optional downstream heating may be used if the next processing step requires fully liquid product.

Frozen Drums Of Concentrate

The right approach depends on what your next processing step needs. A pumpable mixture containing frozen particles is different from a fully liquid ingredient. Understanding that difference is the starting point for choosing equipment and setting realistic production expectations.

Does your product need to thaw completely?

When an order arrives, frozen ingredients may still be in storage. Your team needs to arrange delivery, stage the drums, and prepare enough product to keep production moving.

It’s natural to ask, “How can we thaw these drums faster?”

A useful first question is: “How much thawing does our process actually require?”

Chopper Blender Thawing 2

There are three different conditions to consider:

  1. Product released from the drum: The edges have thawed enough for the frozen block to slide out. Most of the block can remain frozen.

  2. Pumpable slurry: The product contains liquid and small frozen particles. It can move through a suitably selected pump and transfer system.

  3. Fully liquid product: The frozen material has melted sufficiently to meet the next process step’s requirements.

The required endpoint determines how much thawing your process needs. If the next step can accept frozen slurry, complete thawing before mechanical processing may be unnecessary. If it requires fully liquid product, include the additional heating step when planning production.

Why can frozen drum thawing delay production?

There isn’t one thawing time that applies to every drum. In JBT Marel’s article on processing frozen fruit and vegetable products quickly and affordably, traditional methods included letting drums come to room temperature over several days or weeks, or holding them in a chiller at 0–5°C (32–41°F) for 2–4 weeks.

Chopper Blender Thawing 4

Your product, its starting temperature, the container, and the preparation method all affect how quickly it becomes ready for processing. A frozen juice concentrate and a drum of broth should not automatically follow the same preparation schedule.

Ambient conditions introduce further variation. Where drums are prepared, and changes in temperature or season, can affect when the product releases from its container.

Long or poorly controlled thawing can also create food-safety and quality considerations. When time and temperature are not managed well, conditions can allow microbial growth that may affect safety, appearance, and taste. Reducing how much thawing is needed before processing can shorten the time product spends thawing, although appropriate food-safety controls are still required throughout the process.

Before changing equipment, separate the waiting time into retrieval from frozen storage, preparation until the block can leave the drum, loading and processing, transfer to the next vessel, and any additional heating. This shows where a change will make the greatest difference. Faster chopping will not resolve a delay caused by unavailable drums or a downstream tank that is not ready.

What are the main ways to reduce frozen drum thawing time?

1. Improve the existing preparation and staging process

Start by reviewing when drums leave storage, how many are prepared, and when production needs them.

A more consistent schedule may be enough when volumes are low and the existing method reliably meets your requirements. It may also help you avoid preparing more drums than the next production run can use.

The limitation is that scheduling alone does not change how the product responds to its surroundings. If preparation depends on variable ambient conditions, the release time may remain difficult to predict.

2. Use controlled heating to prepare drums for unloading

A hot box or thawing tunnel can provide more controlled conditions for preparing frozen drums.

A hot box handles drums in batches. A tunnel moves them through a controlled heating process on a conveyor. Either approach may be used to loosen the frozen product before mechanical processing.

The preparation target matters. Heating only enough to release a block is a different task from melting its entire contents.

Ask your equipment supplier to evaluate the method against your product, container, required capacity, and available utilities. A preparation time demonstrated for one application is not a universal result.

3. Mechanically process the product before it fully thaws

For suitable ingredients, a Chopper/Blender can reduce the frozen block into a pumpable slurry after it has been released from the drum.

This changes the process from waiting for complete thawing to preparing the product for pumping while some frozen material remains.

How does mechanical frozen drum processing work?

A Chopper/Blender shaves frozen product into small pieces that thaw more readily than a solid block. Its hot-water jackets provide heat that partially thaws the product, creating liquid that mixes with the remaining frozen particles to form a pumpable slurry. This allows the product to move to the next processing step before it has thawed completely.

Chopper Blender Thawing 3

Instead of waiting for a drum to become fully liquid, the process can be designed around the condition the next production step requires:

  • Prepare the drum until the frozen product can release from the container.

  • Unload the product using the appropriate drum and liner-handling procedure.

  • Reduce the frozen block into a pumpable slurry.

  • Transfer the slurry to the next processing step.

  • Add further heating only if the next step requires fully liquid product.

Chopper Blender Demo Thumb

The Chopper/Blender normally produces a pumpable slurry containing frozen particles. It can fully thaw suitable products if they remain in the machine longer, but the extra holding time reduces the number of drums processed per hour.

Alternatively, a properly sized downstream heat exchanger can complete thawing while allowing the Chopper/Blender to maintain its rated processing capacity.

The JBT Marel Chopper/Blender uses this approach for applications including frozen juice concentrates, fruit juices, fruit and vegetable purées, beverage bases, and broths.

How much frozen drum thawing time could your plant save?

The answer depends on the process you are replacing and the condition your product must reach.

Compare the total time from frozen storage to the required downstream condition. Do not compare hours of complete thawing with minutes of chopping as if they produce the same result.

Equipment throughput also differs from total preparation time. JBT Marel’s current capacity guidance is:

Configuration

Quoted processing capacity

Chopper/Blender SE

4 drums per hour

Standalone Chopper/Blender

Up to 24 drums per hour

READYGo Chopper/Blender

Up to 24 drums per hour

These capacities are based on continuous feeding of properly prepared 55-US-gallon drums. Actual throughput varies by product and process conditions. Allow separate time for drum preparation and any additional heating needed for fully liquid output.

Ask for an assessment using your ingredients and operating conditions before using a capacity figure to calculate production savings.

What should you consider before changing your process?

Inconsistent drum preparation or feeding

Drums must be ready when the equipment needs them. If operators repeatedly stop to retrieve or prepare the next drum, actual production output can fall below the machine’s processing capability.

Insufficient hot-water supply

The Chopper/Blender’s hot-water jackets help frozen product move through the machine as it is reduced into a pumpable slurry. They need a suitable water temperature and circulation rate for the product and required throughput.

Check whether your plant’s hot-water supply can meet these requirements. A separate hot-water set can be supplied to heat and recirculate water through the jackets when needed.

A transfer system that cannot handle the slurry

The output still contains frozen particles. Pump selection, pipe layout, and the receiving process must account for that condition.

Long transfers, cold surroundings, and interruptions can create product-flow problems. Depending on the application, the design may require insulation, heated piping, or a heat exchanger near the discharge.

A downstream process that is not ready

Faster drum processing only helps if the next step can receive the product.

If your next step requires fully liquid product, plan for the downstream heat exchanger described above. It serves a different purpose from the hot-water set, which supplies the machine’s heating jackets.

Looking at the entire process helps show whether the main constraint is drum preparation, mechanical processing, transfer, or downstream capacity.

Frozen Drum Processing Layout

When might mechanical frozen drum processing not be the right choice?

A Chopper/Blender is worth evaluating when you need to convert frozen ingredients into slurry for further processing. It is not the best fit for every product or production schedule.

Another approach may be more appropriate when:

  • Your current preparation method already meets your volume and scheduling needs.

  • The product has extremely high viscosity and does not readily move through the equipment. An application review can help determine whether the Chopper/Blender is suitable.

  • Your process requires fully liquid output, but the proposed scope does not include sufficient heating.

  • Your site cannot accommodate the required handling equipment, utilities, or downstream transfer arrangement.

Applications involving individually quick frozen fruit also need a separate review. They may require equipment modifications and process adjustments rather than a standard configuration.

What should you prepare before discussing equipment?

You do not need a completed engineering specification to start. These details will make the initial discussion more useful:

  • The ingredients you process and their condition when received

  • Drum sizes, liner types, and other container formats

  • Current preparation method and time required

  • Required drums per hour and production schedule

  • Whether the next step needs slurry or fully liquid product

  • Available utilities, floor space, and loading access, plus the receiving equipment and proposed transfer route

Include the surrounding costs, too: drum handling, hot-water equipment, pumps, cleaning components, controls, and installation.

A standalone unit allows these elements to be configured around your plant. An integrated system such as the READYGo Chopper/Blender combines the chopper with drum handling, heating, pumping, controls, and cleaning components.

Where should you start to reduce frozen drum thawing time?

Reducing frozen drum thawing time does not always mean applying more heat. For suitable products, it means avoiding a wait for complete thawing that the next step does not require.

Start by defining the required product condition, then look at where your actual constraint sits.

Discuss your frozen drum processing needs

Tell us what you process, how many drums you need per hour, and whether your next step requires slurry or fully liquid product. JBT Marel can help evaluate the equipment, preparation method, and integration requirements for your application.

You can unsubscribe at any time. For more information on how to unsubscribe, our privacy practices and how we are committed to protecting and respecting your privacy, please review our privacy policy.

Login to get full access

Enter password to continue

Wrong password